Here is the condensed list of things to do before we can move into the new building. Please pray with us that we will finish in a timely manner according to God’s will. A lot of progress has been made!! So many volunteers have helped in so many ways! Thank you very much for all your prayers thus far! Please continue to pray for safety of the workers and good weather. God is great! Praise His name!
Fire Relief Water Cistern installed
Kitchen installed
Trim work/Finish Carpentry
Grout sealing
Electricity hooked up
Finish Plumbing
Furnishing
Decorating
Paint touch up
Parking Lot/Finish Grading/Painting of Parking Lot
Landscaping
Fence/Swingset installed
Bathroom stalls installed
Soap/Paper Towel/TP holders installed
Handicap Parking signs ordered and installed
Church sign ordered and installed
Stonework cleaned and touched up
Sound System installed
Flyers/Mailings/Newspaper Ads/Personal Invitations
117
IMG_0963
6/1/12 Luke & his dad, Mark, raking stones
IMG_0964
6/1/12 Pastor Bill and Mr. Goodfellow at work
IMG_0965
6/1/12 Matt Gedeon clearing the foundation before the dirtwork happens.
IMG_0966
6/1/12 Mr. Warner taking out a LOT of trash
IMG_0967
6/1/12 Anna, Mark, & Luke Gedeon raking stones
IMG_0968
IMG_0969
6/1/12 Brannon & Devan Miller, & Billy Reynolds raking stones
IMG_0971
6/1/12 Tabetha raking stones
IMG_0972
6/1/12 Hannah raking stones
IMG_0973
6/1/12 Lenny & Mark the electricians hooking us up
IMG_0974
6/1/12 Michaela raking stones
IMG_0975
6/1/12 The excavators are here!!!
IMG_0976
6/1/12 Pastor Bill and Mr. Goodfellow talking to the excavator
IMG_0977
6/1/12 Mr. Gedeon, Mr. Warner, Matt, & Tabetha trying to move the sand for mortar
IMG_0978
6/1/12 Mr. Goodfellow & Brannon joined the fun
IMG_0979
6/1/12 Background: electricians working on the tubing for the wires, Devan & Billy raking rocks. Pastor Bill & Chris, the excavator, working on grading for the AC units.
IMG_0980
6/1/12 Pastor Bill working on the kitchen
IMG_0981
6/1/12 Luke, Pastor Bill, Brannon working on the kitchen
IMG_0982
6/1/12 Mr. Warner sorting the trash/recyclable waste.
IMG_0983
6/1/12 Tabetha vacuuming the auditorium
IMG_0984
6/1/12 Chris doing some grading
IMG_0985
6/1/12 A meeting of the minds: Mr. Goodfellow, Mr. Warner, Mr. Gedeon
IMG_0986
6/1/12 Cleaning stones: Devan, Anna, Billy, & Hannah
IMG_0987
6/1/12 Michaela & Matt sealing grout
IMG_0988
6/1/12 Brannon & Mr. Goodfellow helping Chris do some grading for the AC unit
IMG_0989
6/1/12 Pastor Bill and Norm, the plumber, talking while Michaela and Luke seal grout
IMG_0990
6/1/12 Tammy Miller cleaning up the floor
IMG_0991
6/1/12 Christy running the shop vac
IMG_0993
6/1/12 Anna watching Pastor Bill make the cut for the sink
IMG_0994
6/2/12 Pastor Bill and Mr. Goodfellow installing another set of kitchen cabinets
IMG_0995
6/2/12 Kitchen sink installed!
IMG_0996
6/2/12 Frank sealing grout
IMG_0998
6/2/12 Matt, Michaela, Billy, & Hannah sealing grout
IMG_0999
6/2/12 sealing grout continues
IMG_1001
6/2/12 Pastor Terry installing baseboards
IMG_1002
6/2/12 Devan filling nail holes for Pastor Terry
IMG_1003
6/2/12 Brannon helping Pastor Terry install baseboards
IMG_1005
6/2/12 Beverly Westcott and Tammy Miller washing windows
IMG_1006
6/2/12 Bev and Tammy cleaning the windows
IMG_1010
6/4/12 Rebecca Gedeon sealing grout
IMG_1011
6/4/12 Mark Gedeon and Anna Gedeon sealing grout
IMG_1012
6/4/12 sealing grout
IMG_1013
6/4/12 Matt Gedeon, Josiah Salmon, and Brannon Miller spreading topsoil
IMG_1014
6/4/12 Spreading topsoil
IMG_1015
6/5/12 CJ Crain watching the plumbers install potties.
IMG_1017
6/4/12 CJ studying the process of plumbing installation
IMG_1018
6/5/12 Pastor Bill installing cabinets in the kitchen
IMG_1019
6/5/12 Beautiful
IMG_1020
6/5/12 Billy helping his dad install the cabinets
IMG_1023
6/5/12 Brannon and Mr. Goodfellow chiseling the tile for the drain basins.
IMG_1025
6/5/12 Plumbing continues
IMG_1027
6/5/12 More demolition . . .
IMG_1029
6/5/12 Billy Reynolds & CJ Crain fixing the recyclable boxes
IMG_1031
6/5/12 Recycling
IMG_1032
6/5/12 Dave on demolition
IMG_1053
6/7/12 Chair delivery!
IMG_1054
6/7/12 Mr. Warner bringing in some chairs
IMG_1055
6/7/12 Pastor Bill and Pastor Terry unloading chairs
IMG_1056
6/7/12 Michaela & Mr. Warner stacking chairs
IMG_1057
6/7/12 Pastor Bill bringing in more
IMG_1058
6/7/12 Hannah vacuuming the stage
IMG_1059
6/7/12 Matt bringing in a load
IMG_1060
6/7/12 Tammy bringing in some chairs
IMG_1061
6/7/12 Billy, Pastor Terry, Brannon, & Mr. Warner at work
IMG_1062
6/7/12 Steady, now!
IMG_1063
6/7/12 Devan Miller helping Brannon get in some chairs
IMG_1064
6/7/12 easy does it–Michaela & Billy
IMG_1065
6/7/12 Devan & Brannon
IMG_1066
6/7/12 smooth landing
IMG_1067
6/7/12 Who’s counting these??
IMG_1068
6/7/12 Sarah Reynolds sweeping up
IMG_1069
6/7/12 Cabinets–the foundation for “Crock Pot Row”
IMG_1070
6/7/12 Liz Rossi sweeping up
IMG_1071
6/7/12 Liz’ friend Carol sweeping up, too!
IMG_1072
6/7/12 Pastor Terry and Pastor Bill talking appliances
IMG_1073
6/7/12 Devan packing the cardboard for recycling
IMG_1074
6/7/12 Billy & Brannon packing the cardboard
IMG_1076
6/7/12 Christy vacuuming
IMG_1077
6/7/12 Pastor Bill at the end of “Crock Pot Row”
IMG_1078
6/7/12 Shiny sinks!
IMG_1079
6/7/12 Kitchen
IMG_1080
6/7/12 Men’s Room plumbing installed
IMG_1081
6/7/12 Men’s Room sinks
IMG_1082
6/7/12 Ladies’ Room sinks
IMG_1083
6/7/12 Ladies’ Room plumbing
IMG_1085
6/9/12 Frank cleaning grout sealer
IMG_1086
6/9/12 Michaela sealing grout
IMG_1087
6/9/12 Brannon, Matt, & Devan cementing the plumbing holes
IMG_1088
6/9/12 Brannon vacuuming before the cement
IMG_1090
6/9/12 Billy & Devan watching Mr. Matt cement the plumbing hole
IMG_1091
6/9/12 Cullen looking for a nail punch to put up baseboards
IMG_1092
6/9/12 Pastor Bill looking for the nail punch, too.
IMG_1093
6/9/12 Anna & Michaela sealing grout
IMG_1130
6/19/12 Sue Goodfellow putting on the crib skirt she altered to fit the crib.
IMG_1131
6/19/12 Mrs. Goodfellow & Christy moving the crib
IMG_1132
6/19/12 Lenny hooking up the AC units
IMG_1133
6/19/12 Chris the excavator doing some grading
IMG_1135
6/19/12 Lunch for the workers! Mrs. Sue, Billy, & Sarah providing company/”entertainment” during lunch . . . 😉
IMG_1136
6/19/12 JR the excavator clearing the front of the lot
IMG_1137
6/21/12 Pastor Bill putting up Azek bead board on the back of the cabinets.
IMG_7513
6/20/12 Brannon touching up baseboards
IMG_7514
6/20/12 Pastor Bill cutting baseboard
IMG_7516
6/20/12 Matt touching up baseboards
IMG_7519
6/22/12 Mark cleaning up the photo cell
IMG_7520
6/22/12 Anna touching up the door frame
IMG_7521
6/22/12 Matt touching up the door frame
IMG_7522
6/22/12 Brannon taping door hinges in preparation for painting
IMG_7523
6/22/12 Lenny moving the outlets
IMG_7524
6/22/12 The “bubblah!”
IMG_7525
6/22/12 Lenny and his family
IMG_7531
6/24/12 Sunday worship–figured we needed something besides construction pictures once in a while! 🙂
IMG_1180
6/26/12 Pastor Bill touching up the baseboard on the kitchen cabinet backing.
IMG_1179
6/26/12 Pastor Bill opening the kitchen half door
IMG_1178
6/26/12 Matt priming the door
IMG_1176
6/22/12 Matt painting the columns
IMG_1175
6/26/12 The kitchen awaiting only the appliances!!
IMG_1172
6/26/12 Kitchen with half-door open