Thank you so much for all your prayers! God has been so good–we are very close to being done! Please continue to pray for safety and wisdom. Thank you so much!
Still to be done (condensed version):
Fire Relief Water Cistern installed
Kitchen appliances installed
Trim work/Finish Carpentry
Finish Plumbing
Furnishing
Decorating
Paint touch up
Parking Lot/Finish Grading/Painting of Parking Lot
Landscaping
Fence/Swingset installed
Handicap Parking signs ordered and installed
Church sign ordered and installed
Sound System installed
Flyers/Mailings/Newspaper Ads/Personal Invitations
6/29/12 Bathroom stalls!
6/29/12 Bathroom stalls!
6/30/12 Ray collecting trash
6/30/12 Matt’s painted door
6/30/12 Frank prepping the baptistry opening for trimwork
6/30/12 Matt working on the loose tile
6/30/12 Anna touching up
6/30/12 Pastor Bill cleaning up
6/30/12 Devan cleaning up
6/30/12 Tammy cleaning
6/30/12 Pastor Terry moving door closers
6/30/12 cleaning so fast it’s a blur! 🙂
6/30/12 Pastor Terry installing door closers
6/30/12 Matt & Brannon fixing loose tiles
6/30/12 Anna & Devan touching up baseboards
6/30/12 Tammy & Christy sweeping up
6/30/12 Frank cleaning out the utility closet
6/30/12 Travis, master electrician, turning on the lights!!!! (yay!)
6/30/12 Brannon & Matt fixing a drain pipe
7/6/12 Pastor Bill putting trimwork on the stage
7/7/12 Pastor Bill putting on baseboards
7/7/12 Tommy Goodfellow working on the baseboards
7/7/12 Brannon touching up the wall
7/7/12 Frank cutting baseboards
7/7/12 Christy putting the mops away
7/7/12 Frank and Tommy Goodfellow cutting baseboards
7/7/12 Sue Goodfellow measuring the sinks to find mirrors
7/7/12 Brannon & Matt touching up baseboards
7/7/12 Anna sanding the wall
7/7/12 Pastor Bill & Tommy Goodfellow bringing in mirrors
7/7/12 Christy unloading a mirror for the restroom
7/7/12 Tommy Goodfellow fixing the ladies’ bathroom cabinet
7/10/12 Dave Nobles & Tommy Goodfellow working on the sound system
7/10/12 Waiting for Devan to assemble the bottom of the cabinet
7/10/12 Devan helping Tammy & Sue
7/10/12 Tommy, Brannon, & Matt working the wires for the sound system
7/10/12 Pastor Bill & Brannon working on the ceiling
7/10/12 Christy filling the soap dispensers in the kitchen
7/10/12 Sound system work
7/10/12 Sue & Tammy putting together the cabinets, Sarah providing moral support
7/10/12 Billy is taller than “Nana Gaye!”
7/10/12 Pastor Bill doing the ceiling work for the sound system
7/10/12 Dave Nobles from Bethel FWB Church in Woodbridge, VA, here to intsall the sound system. Crew: Tommy Goodfellow, Matt Gedeon, Gaye Nobles supervising 🙂
7/10/12 Tammy helping Sue Goodfellow put together a classroom cabinet
7/10/12 Gaye Nobles
7/10/12 Christy painting the top of the nursery shelf
7/10/12 Gaye Nobles from Bethel FWB Church in Woodbridge putting the finish coat on the nursery shelf
7/10/12 Tammy putting the finish coat on the nursery shelf
7/10/12 Digging for the fire relief water cistern
7/11/12 The hole all ready for the fire relief water cistern
7/11/12 Tabetha flushing the toilet.
7/11/12 It works!!
7/11/12 Tammy running sink water. YAY!!
7/11/12 Billy & Sarah holding the door for the piano guys. Devan supervising.
7/11/12 Luca Music delivering the church piano!!!!
7/11/12 officially off the truck
7/11/12 going through the front door
7/11/12 coming through the vestibule
7/11/12 Hold it steady, boys!
7/11/12 Up the ramp
7/11/12 Holding it in place
7/11/12 undoing the straps
7/11/12 Unwrapping the piano
7/11/12 the bottom of the piano–soundboard, supports, etc.
7/11/12 waiting on the legs
7/11/12 “Peekaboo!”
7/11/12 putting the legs on with bolts
7/11/12 Putting the legs on
7/11/12 Putting a piano together is hard work–let’s have some air conditioning!
7/11/12 Pastor Terry turning on the AC! YAY!
7/11/12 unwrapping the bottom
7/11/12 Hold it steady now!
7/11/12 getting it off the dolly
7/11/12 Easy does it!
7/11/12 Getting ready for the last leg
7/11/12 Putting the last leg on
7/11/12 The guys from Luca Music had quite an audience! The Millers, Reynolds, Tabetha, & the Nobles watched with interest.
7/11/12 Attaching the pedals
7/11/12 Attaching the pedals
7/11/12 Almost ready
7/11/12 All together and ready to play!
7/11/12 Christy playing “Jesus Loves Me”
7/11/12 Christy playing “Happy Birthday” to Tabetha–first song on the piano in the new church! 🙂
7/11/12 Tammy trying out the new piano
7/11/12 Tammy playing “Let My Life be a Light”
7/12/12 Fire Relief Water Cistern delivery
7/12/12 Cistern
7/12/12 First half in
7/12/12
7/12/12 speakers and projector installed!
7/12/12 soundboard
7/12/12 nursery speaker
7/12/12 filling in the hole
7/13/12 Brannon & Matt fixing more tiles
7/13/12 Pastor Nobles working on the sound system wiring
7/13/12 shiny knobs!
7/13/12 Peter & Anna washing walls
7/13/12 Pastor Nobles setting it all up
7/14/12 the pulpit in place
7/14/12 Brannon & Pastor Terry working on installing appliances
7/14/12 getting ready for the hoods
7/14/12 Hoods
7/14/12 Michaela testing out the piano
7/14/12 Lunch break
7/14/12 Pastor Bill vacuuming the wood shavings from the pulpit microphone holes he drilled
7/14/12 perfect fit!
7/14/12 Matt setting up the microphones
7/14/12 getting ready for the hoods
7/14/12 Brannon & Pastor Terry bracing the cabinets for the hoods
7/14/12 Michaela with “Nana Gaye” Nobles
7/16/12 Brannon & Mr. Warner putting racks on the chairs and adusting the ganging feature
7/15/12 Pastor Bill adjusting the projectors
7/15/12 so much to do!
7/15/12 Devan joined the chair fixing party
7/15/12 Pastor Nobles & Matt setting up the wiring
7/16/12 Pastor Bill marking the trim for the baptistry
7/16/12 Pastor Bill marking the baptistry trimwork
7/16/12 Gaye Nobles vacuuming the chairs
7/16/12 Mr. Warner & Matt arranging rows mathematically. 🙂
7/16/12 Pastor Bill & Mr. Warner getting a straight line for the chairs
7/16/12 Bethany & Candice brought lunch to Uncle Matt
7/16/12 Filling the baptistry!!! 🙂